01 / THE BRIEF
The challenge: complete a full renovation of a 120 m² dental clinic within a strict 33-day deadline while the entire medical team was on holiday. Every day mattered. The clinic had to be ready for the doctors to return and resume work without delays.
02 / DESIGN SOLUTION
A complete technical design package was developed to guide the renovation, followed by full on-site design supervision throughout the implementation. With precise planning, continuous quality control and coordinated execution, the entire renovation was completed in just 29 days — four days ahead of schedule.
03 / SCOPE OF WORK
- Complete technical design documentation - Renovation planning and technical detailing - Full on-site design supervision - Construction quality and design compliance control - Coordination of technical decisions during implementation - Final inspection of completed works